Contact Us

Tel:+86-379-65163458
E-mail:woma@lysteelfurniture.com
Address:Woma Industrial Base, Yibin High-tech Development Zone, Luoyang, P.R. China

Steel Warehouse Shelving

Steel Warehouse Shelving – 79'' Height x 79'' Width x 20''Depth

Steel Warehouse Shelving – 79'' Height x 79'' Width x 20''Depth


Feature:


Unique design allows individual shelves to roll-out for easier access.

* Roll-out design allows for access to shelves with overhead crane.

* Shelves lock in the extended position for maximum safety.

* Shelf capacity is 1,500 lbs each - Total shelving capacity is 6,000 lbs.

* Shelf height is adjustable on 2-3/8" centers.

* Shelves are manufactured from 10-gauge steel.

* Environmental coated finish.

* Ships knock-down and palletized.


Product description:


Little Giant - 79" High Steel Warehouse Shelving (2,000 lb shelf cap) are made using reinforced Environmental coated steel for lasting durability and strength. Available shelf quantities are 4, 5 and 6. 2” x 2” x 3/16” thick corner angles have footpads with anchors to provide added stability. Each shelf holds up to 2000 lbs. Dimensions vary per model. Fully assembled. 

Steel Warehouse Shelving.jpgSteel Warehouse Shelving.jpg



Product Name

Steel Warehouse Shelving

Material

High quality cold rolled steel sheet

Item model number

W-S02

Steel Thickness (mm)

1.8mm

Item Weight (KG)

75kg

Size (mm)

H2000*W2000*D500  

Surface

Durable Electrostatic Powder Coating

Volume

0.42

Loading capacity

65 pcs/20GP  160 pcs/40HQ

Delivery Time

25 days after deposit

MOQ

50 Pieces

Payment Terms

T/T, 30% Deposit

Supply Ability

8000 Pieces per Month


Product advantage:


Four-storey shelves, each shelf has been strengthened, and the two pillars of the shelf are also strengthened. There is no need to worry about bearing weight, multiple screws are stably reinforced, and the bottom of the shelf column is equipped with anti-friction feet to prevent ground scratches and protect. The shelf posts are not subject to wear. These can be seen from the picture.


Manufacture processing:


1. Prepare raw material.

2. Press and measure steel sheet to be completely flat.

3.Cut steel sheets in a accurately size and punch necessary holes or shapes on it.

4. Bend the steel sheet to have an edge or side.

5. Welding holders to keep products more stable and have higher-capacity.

6. Acid washing every product,  then rust-proof, static power coating and drying

7. QC 

8. packing.


Conatct us click:http://www.wmsteelfurniture.com/contact-us


Hot Tags: steel warehouse shelving, manufacturer, supplier, factory, quotation, price
Inquiry